PassReview H35-912-ENU Dumps Real Exam Questions Test Engine Dumps Training [Q15-Q37]

Share

PassReview H35-912-ENU Dumps Real Exam Questions Test Engine Dumps Training

Huawei H35-912-ENU exam dumps and online Test Engine

NEW QUESTION 15
Which of the following should be noted when handling goods? (Multiple choice)

  • A. Unobstructed passage
  • B. Rigging is secure
  • C. Sufficient staff
  • D. Can't drag directly on the ground

Answer: A,B,C,D

 

NEW QUESTION 16
Server survey includes two scenarios, one for determining the configuration of the BoQ for the pre-sales phase and for the supply chain, and the other for the detailed installation for hardware installation.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 17
Which of the following are typical products for copper wire access? (Multiple choice)

  • A. DSL terminal
  • B. MSAN
  • C. DSLAM
  • D. OLT

Answer: A,B,C

 

NEW QUESTION 18
There must be no connectors in the middle of the protective ground wire. It is strictly forbidden to install switches or fuses on the protective earth wire.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 19
What is the correct statement about the layout specification of the OceanStor 18000 V3 storage cable? (Multiple Choice)

  • A. The power cable and ground wire should be smooth at the turn.
  • B. The wire diameter of the power cable and ground wire of the equipment should meet the power distribution requirements of the equipment.
  • C. The bending radius of the fiber placement should not exceed 50mm
  • D. When the cable is laid, it should be straightened out without bending

Answer: A,B,D

 

NEW QUESTION 20
W hat is the correct treatment method for snakes found in the site?

  • A. Notification of wildlife protection related organizations
  • B. Direct death
  • C. Drive the snake to a distance

Answer: A

 

NEW QUESTION 21
Regarding power-on and power-off, which of the following statements is correct? (Multiple Choice)

  • A. Do not plug or unplug cables and FRU (Reid Replaceable Unit) modules during power-on, otherwise data may be lost.
  • B. Do not cut off the power before the hard disk running indicator stops flashing to avoid damage to the hard disk and data loss.
  • C. After turning off the power, you can turn it back on immediately.
  • D. Please wait at least 1 minute after turning off the power, then turn the power back on.

Answer: A,B,D

 

NEW QUESTION 22
All new partners must first interview the corresponding project manager and product line technical leader before entering the area, and sign the safety production commitment letter, the network safety behavior red line commitment letter, and receive the supervision certificate before entering the area, new employees do not allow to operate the existing network equipment.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 23
How many hard disks in each high-density disk enclosure of OceanStor V3 store?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A

 

NEW QUESTION 24
Which of the following statements about the up-and-down about PON technology is correct?

  • A. PON technology data downlink uses broadcast
  • B. PON technology data uplink uses broadcast
  • C. PON technology downlink adopted wavelength is 1310nm.
  • D. PON technology uplink adopted wavelength is 1490nm

Answer: A

 

NEW QUESTION 25
How many fan modules does the E9000 support?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 26
The "High Risk Operation Plan" can be implemented at any time after being reviewed and approved by the technical representative of the customer and the representative office.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 27
What is the purpose of keeping the work site tidy?

  • A. Just to meet the requirements of the EHS specification
  • B. Prevent nails and other protrusions from injuring workers or tripping them
  • C. Make your work comfortable

Answer: B

 

NEW QUESTION 28
Which of the following does not belong to the RF port number type of the MA5633?

  • A. 0 in 2 out
  • B. 0 in 4 out
  • C. 0 in 3 out
  • D. 4 in 4 out

Answer: C

 

NEW QUESTION 29
For the inspection of PPE, it only needs to be carried out at the site, and it is not necessary to check before departure.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 30
Which of the following is the general cabinet power-on procedure?

  • A. Cabinet input power distribution switch closed -> chassis module power switch closed -> single board switch closed
  • B. Chassis module power switch closed -> cabinet input power distribution switch closed -> single board switch closed.
  • C. Cabinet input power distribution switch closed -> single board switch closed -> chassis module power switch closed
  • D. Single board switch closed -> chassis module power switch closed -> cabinet input power distribution switch closed

Answer: A

 

NEW QUESTION 31
What are included in the electrical safety requirements? (Multiple Choice)

  • A. Do not place the power cord on the ground.
  • B. Damaged power supply components must be replaced in time.
  • C. Do not overload the power supply.

Answer: A,B,C

 

NEW QUESTION 32
When tower cranes climb towers, they need to wear safety gloves. One of the important functions is anti-slip.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 33
Which of the following are part of the server survey preparation? (Multiple choice)

  • A. Communicate with the management of the bureau to determine the time of the survey
  • B. Understand the device configuration of the site
  • C. Fill in the data sheet of the engineering survey
  • D. Print engineering survey data sheet

Answer: A,B,D

 

NEW QUESTION 34
The MA5616 is mainly used in FTTC/B scenarios. What services are provided for access? (Multiple Choice)

  • A. DSL access
  • B. POTS access
  • C. Power access
  • D. LAN access

Answer: A,B,D

 

NEW QUESTION 35
In the process of powering up the server, which indicator status indicates that the server is in the Standby state?

  • A. Off
  • B. Yellow long bright
  • C. Green long bright
  • D. Yellow flashing

Answer: B

 

NEW QUESTION 36
Which of the following is the correct order to install the cabinet?

  • A. Place the cabinet -> Fix the cabinet -> Position the cabinet -> Level the cabinet
  • B. Position the cabinet -> place the cabinet -> Fix the cabinet -> level the cabinet
  • C. Position the cabinet -> Fix the cabinet -> place the cabinet -> level the cabinet
  • D. Place the cabinet -> Position the cabinet -> Fix the cabinet -> Level the cabinet

Answer: B

 

NEW QUESTION 37
......

Huawei H35-912-ENU: Selling Huawei Certified Specialist Products and Solutions: https://www.passreview.com/H35-912-ENU_exam-braindumps.html