Cisco 350-601 exam is designed for IT professionals who have experience in implementing data center technologies. 350-601 exam tests the candidate's knowledge of data center infrastructure, including routing and switching protocols, storage networking technologies, and virtualization technologies. It also tests their ability to implement automation and orchestration tools, manage data center security, and troubleshoot data center issues.
Preparation Phase
After exploring the exam topics, it is time to start your preparation process. The best way to build the requisite knowledge foundation for the test is to enroll for the official training course, Implementing and Operating Cisco Data Center Core Technologies (DCCOR). It is available in several formats. The candidates can opt for the 5-day instructor-led training in the physical classroom with hands-on lab practice. Alternatively, they can select the virtual instructor-led training, which includes 5 days of web-based classes with lab practice. Lastly, there is the option of self-paced E-learning. It is designed for 8 days of learning experience with videos, practice, and challenges.
NEW QUESTION # 177
A customer data center is configured for distribution of user roles, call home, and NTP. The data center was split into two geographically separate locations called DC1 and DC2. The requirement is for the user role configurations to be distributed in DC1 and for NTP and call home features to be constrained to DC2. Which two configuration sets must be used to meet these requirements? (Choose two.)
- A. Option B
- B. Option C
- C. Option D
- D. Option A
- E. Option E
Answer: B,C
Explanation:
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/sw/4_2/nx-os/system_management/ configuration/guide/sm_nx_os_cli/sm_2cfs.html
NEW QUESTION # 178
An engineer must shut down the Ethernet 1/2 interface when the Ethernet 4/5 interface state is down. Drag and drop the CLI commands from the bottom onto the blanks in the exhibit to implement this EEM. Not all commands are used.
Answer:
Explanation:
Explanation
Text Description automatically generated
NEW QUESTION # 179
Refer to the exhibit.
An engineer must monitor all LAN traffic on Fabric A from a blade server. Which source should be configured in the test-span monitor session to complete this task?
- A. all uplink FCoE ports
- B. all uplink Ethernet ports
- C. all vNICs from the service profile that correspond to this server
- D. all vHBAs from the service profile that correspond to this server
Answer: C
Explanation:
https://www.cisco.com/en/US/docs/unified_computing/ucs/sw/gui/config/guide/141/UCSM_GUI_Configuration_Guide_141_chapter45.html
NEW QUESTION # 180
Which two statements about OTV are true?(Choose two)
- A. The join interface must be a Layer 2 interface.
- B. The authoritative edge device is the active forwarder for multicast and unknown unicast for all VLANs.
- C. OTV runs over a distance victor routing protocol.
- D. Only one join interface can be specified per overlay.
- E. OTV requires a separate VDC if SVIs for the extended VLANs are to be configured on the same switch.
- F. no special license is required for OTV.
Answer: D,E
NEW QUESTION # 181
Drag and drop the firmware packages from the left onto the software bundles they belong to on the right.
Answer:
Explanation:
Explanation:
Diagram Description automatically generated
NEW QUESTION # 182
In an FCoE environment, for which two sets of data must an interface that implements the PAUSE mechanism always provision sufficient ingress buffer? (Choose two)
- A. frames that were sent with high credit
- B. frames that were processed and transmitted by the transmitter before the PAUSE frame left the sender
- C. frames that were processed and transmitted by the transmitter after the PAUSE frame left the sender.
- D. frames that were sent on the link and received.
- E. frames that were sent on the link but not yet received.
Answer: B,E
Explanation:
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus7000/sw/fcoe/config/ cisco_nexus7000_fcoe_config_guide_8x/configuring_fcoe.html
NEW QUESTION # 183
A network administrator must create a Linux container on a Cisco Nexus Series Switch. The container requires 10 percent of the CPU of the switch and 1024 MB of RAM to run successfully. Which task provides the necessary resources?
- A. Edit the container properties with the guestshell run command.
- B. Increase the compute resources with the guestshell resize command.
- C. Enable the Bash shell of the switch with the feature bash command
- D. Modify resource allocation with the virtual-service resize command.
Answer: B
NEW QUESTION # 184
Drag and drop the storage technologies from the left onto the correct descriptions on the right.
Answer:
Explanation:

NEW QUESTION # 185
What is a characteristic of EPLD updates on Cisco MDS 9000 Series Switches?
- A. EPLD bundles are released separately from a Cisco MDS NX-OS release
- B. EPLD updates are nondisruptive to traffic flow
- C. EPLD updates are installed only via the Cisco DCNM GUI
- D. EPLD packages update hardware functionality on a device
Answer: D
Explanation:
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/mds9000/sw/6_2/release/notes/epld/epld_rn.html
NEW QUESTION # 186
A server engineer wants to control power usage on a Cisco UCS C-Series rack server down to the component level.
Which two components support specific power limits? (Choose two.)
- A. storage controller
- B. network controller
- C. processor
- D. memory
- E. graphic card
Answer: A,B
Explanation:
Section: Compute
Explanation/Reference:
NEW QUESTION # 187
An engineer is implementing NetFlow on a Cisco Nexus 7000 Series Switch. Drag and drop the NetFlow commands from the left into the correct order they must be entered on the right.
Answer:
Explanation:
Explanation
1- feature netflow
2- flow exporter
3- flow monitor
4- interface<interface>
NEW QUESTION # 188
An engineer must suggest a deployment model for a newly developed application. The engineer has a small starting budget and lacks technical knowledge and infrastructure to implement store, operating system and database services to support the application deployment. The engineer also needs usage data related to the service and the ability to elastically scale the deployment as customer demands grow.
Which two models must be used to meet the requirements? (Choose two)
- A. software as a service
- B. private cloud
- C. infrastructure as a service
- D. platform as a service
- E. public cloud
Answer: D,E
Explanation:
1. public cloud --> elastically scale the deployment
2. platform as a service --> store, operating system and database
NEW QUESTION # 189
An engineer must configure a VXLAN routing on a cisco Nexus 9000 series Switch. The engineer requires a solution where all the leaf switches have the same gateway MAC and IP address. Which configuration set accomplishes this task?
A)
B)
C)
D)
- A. Option D
- B. Option B
- C. Option C
- D. Option A
Answer: C
NEW QUESTION # 190
An engineer configures a storage environment for a customer with high- security standards. The secure environment is configured in vsan 50. The customer wants to maintain a configuration and active databases and prevent unauthorized switches from joining the fabric. Additionally, the switches must prevent rogue devices from connecting to their ports by automatically learning the WWPNs of the ports connected to them for the first time. Which two configuration sets must be used to meet these requirements? (Chose two.)
- A. Option D
- B. Option B
- C. Option C
- D. Option E
- E. Option A
Answer: C,E
NEW QUESTION # 191
An engineer is implementing the Cisco ACI fabric and must create two different vPCs from leaf switches A and B. The vPCs are deployed as follows:
- vPC 1 encompasses ports Eth 1 /1 on leaf A and B and connects to
server 1.
- vPC 2 encompasses port Eth1/2 on leaf A and B and connects to server
2.
A leaf switch profile listing leaves A and B is already configured Which ACI object must be created to meet these requirements?
- A. one access port interface policy group
- B. two vPC interface policy groups
- C. two PortChannel interface policy groups
- D. one vPC interface policy group
Answer: B
NEW QUESTION # 192
An engineer is configuring VNTag between a virtualized server and a Cisco Nexus 5500 Series switch. Drag and drop the configuration steps from the into the correct order on the right.
Answer:
Explanation:
Explanation
install the virtualization feature set
Enable the virtualization feature set
Configure the port profile
Configure support for VNTag mode on the interface that connects to the server.
Configure the server to support NIV mode
Configure the vNICs of the server
NEW QUESTION # 193
A customer asks an engineer to develop an orchestration solution to automate repetitive tasks. The customer operations team must integrate the tool with its existing automation framework. The customer asks for the tool to support these requirements:
*The customer's security requirements mandate the use of SSH transport.
*No extra software must be installed on the managed systems.
*The support staff has limited knowledge of scripting languages, so the solution must be easy to read and use declarative language.
Which solution meets these requirements?
- A. PowerShell
- B. Puppet
- C. Chef
- D. Ansible
Answer: D
Explanation:
Ansible meets the requirements as it uses SSH for transport, does not require agent software to be installed on managed systems, and uses YAML for its playbooks, which is a human-readable data serialization standard, making it easy to read and use for people with limited knowledge of scripting languages.
References: Cisco's official documentation on network automation orchestration solutions and the Implementing and Operating Cisco Data Center Core Technologies (DCCOR) course materials.
NEW QUESTION # 194
A Cisco Nexus 7000 Series switch runs VXLAN, and interface Ethernet 7/30 is configured as a trunk port. Which command set configures the switch to act as a gateway for VLAN 50?
interface Ethernet7/30
no switchport
no shutdown
service instance 1 vni
no shutdown
encapsulation profile VSI_50_TO_500 default
- A. encapsulation profile vni VSI_50_TO_500
dot1q 50 vni 500bridge-domain 50
member vni 500
interface Bdi50
ip address 10.50.50.51/24 - B. encapsulation profile vni VSI_50_TO_500
dot1q 500 vni 50
bridge-domain 500
member vni 50
interface Vlan500
ip address 10.50.50.51/24 - C. encapsulation profile vni VSI_50_TO_500
dot1q 50 vni 500
bridge-domain 50
member vni 500
interface Vlan50
ip address 10.50.50.51/24 - D. encapsulation profile vni VSI_50_TO_500
dot1q 500 vni 50
bridge-domain 500
member vni 50
interface Bdi500
jp address 10.50.50.51/24
Answer: B
Explanation:
The internal interface on the VTEP is configured as a layer-3 port. However, there is no IP assigned to it. It is also important to note that the BD value defined on the VTEP does not have to match the VLAN ID on the device from which you are sending the traffic. However, the dot1q to VNI mapping defined in the encapsulation profile, which is called under the service instance on the internal interface, must match the VLAN ID on the device from which you are sending the traffic.
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus7000/sw/vxlan/config/cisco_nex us7000_vxlan_config_guide_8x/configuring-vxlan-flood-and- learn.html#:~:text=and%20Learn%20Configuration-,Example%20of%20VXLAN%20Flood%20an d%20Learn%20Configuration,-The%20following%20example
NEW QUESTION # 195
Refer to the exhibit.
Refer to the exhibit. An engineer must invoke a Python script that alerts the operations team when the router DC-RTR-1 becomes unreachable. Which configuration set accomplishes this task?
- A. Option B
- B. Option D
- C. Option C
- D. Option A
Answer: B
NEW QUESTION # 196
Refer to the exhibit. An engineer needs to implement streaming telemetry on a cisco MDS 9000 series switch. The requirement is for the show command data to be collected every 30 seconds and sent to receivers. Which command must be added to the configuration meet this requirement?
- A. Sensor-grp 200 sample-period 30000
- B. Sensor-grp 200 sample-period 30
- C. Snsr-grp 200 sample-interval 30000
- D. Snsr-grp 200 sample-interval 30
Answer: C
NEW QUESTION # 197
An engineer must shut down the Ethernet 1/2 interface when the Ethernet 4/5 interface state is down. Drag and drop the CLI commands from the bottom onto the blanks in the exhibit to implement this EEM. Not all commands are used.
Answer:
Explanation:
NEW QUESTION # 198
......
Cisco 350-601 Official Cert Guide PDF: https://www.passreview.com/350-601_exam-braindumps.html
Exam 350-601: Implementing Cisco Data Center Core Technologies (350-601 DCCOR) - PassReview: https://drive.google.com/open?id=1MsT8nOFm6n-4I3C3JHNtvsr_CF2rldiE