NEW QUESTION # 51
What configuration parameters must be ready before deploying the PowerProtect Cyber Recovery virtual appliance?

  • A. NTP, DNS, FQDN, and IP address of the VM
  • B. IP address of the VM, DNS, NTP, and default gateway
  • C. IP address of the VM, DNS, FQDN, and VLAN ID
  • D. FQDN, DNS, default gateway, and IP address of the VM

Answer: D


NEW QUESTION # 52
In the context of upgrading Cyber Recovery software on AWS, which of the following are crucial steps?

  • A. Verifying the compatibility with AWS EC2 instances
  • B. Ensuring IAM roles are correctly configured
  • C. Scheduling the upgrade during peak business hours
  • D. Performing a backup before the upgrade process

Answer: A,B,D


NEW QUESTION # 53
Which security feature is essential to configure in PowerProtect Cyber Recovery to enhance access security?

  • A. Biometric authentication
  • B. End-to-end encryption for data in transit
  • C. Multi-Factor Authentication (MFA)
  • D. Single sign-on (SSO) with social media accounts

Answer: C


NEW QUESTION # 54
Effective troubleshooting of a Cyber Recovery solution typically involves:

  • A. Checking system logs for error messages
  • B. Restarting the entire server system
  • C. Using CLI tools to diagnose connectivity issues
  • D. Inspecting the UI for any irregularities

Answer: A,C,D


NEW QUESTION # 55
PowerProtect Cyber Recovery management tools are used for:

  • A. Monitoring system performance
  • B. Ensuring data compliance
  • C. Generating financial reports
  • D. Automating backup schedules

Answer: A,B,D


NEW QUESTION # 56
A customer is unable to deploy the PowerProtect Cyber Recovery Virtual Appliance.
Their system specifications are:
- vCenter 7.0
- 4 CPUs
- 8 GB RAM
- 150 GB available storage
Why are they unable to deploy the virtual appliance?

  • A. Incompatible vCenter environment
  • B. Memory constraint
  • C. Insufficient disk space
  • D. Insufficient CPU

Answer: C


NEW QUESTION # 57
Which applications asset requires the PermitRootLogin parameter set to Yes in the SSH configuration before adding the asset to PowerProtect Cyber Recovery?

  • A. PowerProtect Data Manager
  • B. PowerProtect DD
  • C. CyberSense
  • D. Avamar

Answer: D


NEW QUESTION # 58
An administrator is running PowerProtect Cyber Recovery 19.1 and wants to upgrade to 19.13.
What version must they upgrade to before upgrading to 19.13?

  • A. 19.2
  • B. 19.9
  • C. 19.6
  • D. 19.7

Answer: D


NEW QUESTION # 59
When sizing the CyberSense server in the vault, what is the minimum network bandwidth required?

  • A. One 10 GB NIC
  • B. One 5 GB NIC
  • C. Two 10 GB NIC
  • D. Two 1 GB NIC

Answer: A


NEW QUESTION # 60
Which backup applications are supported by CyberSense analyze operations?

  • A. NetWorker, Avamar, PowerProtect Data Manager, and NetBackup.
  • B. NetWorker, Avamar, Veeam, and Veritas NetBackup.
  • C. PowerProtect Data Manager, NetWorker, IBM BRMS, and NetBackup.
  • D. Avamar, Veeam, NetBackup, and IBM Tivoli Storage Manager.

Answer: A


NEW QUESTION # 61
In the context of PowerProtect Cyber Recovery, what is the primary purpose of implementing policies?

  • A. To automate the process of data recovery and backup
  • B. To optimize the storage utilization and cost
  • C. To monitor network traffic for potential cyber threats
  • D. To define user access levels within the system

Answer: A


NEW QUESTION # 62
What is an important network consideration in the design of a PowerProtect Cyber Recovery solution?

  • A. Isolating the network from the primary data center network
  • B. Implementing a mesh topology for enhanced connectivity
  • C. Using wireless connections for flexibility
  • D. Ensuring high bandwidth for daily operational data transfer

Answer: A


NEW QUESTION # 63
Which type of cyber attack relies on trap or deception?

  • A. Banking trojan
  • B. Business email compromise
  • C. Spam
  • D. Adware

Answer: B


NEW QUESTION # 64
What is used to control the workflow between the production environment and the PowerProtect Cyber Recovery vault?

  • A. Policies
  • B. Jobs
  • C. Copies
  • D. Schedules

Answer: A


NEW QUESTION # 65
Which factor is critical when considering server specifications for deploying a PowerProtect Cyber Recovery software solution?

  • A. The server's ability to support virtualization technologies
  • B. The server's physical size for efficient data center space utilization
  • C. The color and design of the server for visual identification
  • D. The server's compatibility with legacy operating systems

Answer: A


NEW QUESTION # 66
......